
Specialist interiors, delivered properly.
Drylining, partitions, MF ceilings, plastering, tape & jointing, SFS and FIRAS-certified passive fire stopping for main contractors – on student accommodation, commercial, healthcare, hospitality, industrial, retail and residential projects.
One specialist team for your interior packages – from first fix to a decoration-ready finish, with fire stopping you can trace.
Systems we work with
We install plasterboard, framing and fire-stopping products from manufacturers including these. Logos are trademarks of their respective owners.
Services
Price a single trade or bring several packages together for one point of contact on site.
Drylining & partitions
Metal stud partitions and wall linings, set out and built to programme.
02Suspended & MF ceilings
MF plasterboard ceilings, feature rafts, bulkheads and grid ceilings.
03Plastering
Skim and airless spray plaster finishes, ready for decoration.
04Tape & jointing
Flat, crisp joints and corners to walls and ceilings.
05Passive fire stopping
FIRAS-certified penetration sealing – every seal labelled.
06SFS (steel framing systems)
Steel framing infill walls and external sheathing boards.
Selected projects
A look at recent DP Interiors packages, from hospitality ceilings to industrial fire stopping. All projects

Musgrove Park Hospital, Taunton
2024 · 7 photos

Retail & leisure fit-outs
Nationwide · 16 photos

The Ivy, Stratford-upon-Avon
2026 · 2 photos

Industrial unit fire stopping, Avonmouth
2026 · 2 photos

Passive fire stopping – labelled penetrations
Nationwide · 5 photos



Fire stopping, done properly.
Fire stopping is a life-safety package, and it has to stand up to inspection. Ours is third-party certified, and every seal is labelled.
- FIRAS third-party certifiedThird-party certified for penetration sealing.
- Every seal labelledEach penetration carries a DP Interiors identification label with a QR code.
- Tested products, tested detailsSeals installed to the manufacturer's tested details for each service and substrate.
- Traceable at handoverLabelled and recorded so it can be found, inspected and signed off.
Where we work
The same standard on every site, whether it's a student scheme, a hospital ward, a hotel bar or a distribution warehouse.

Student accommodation
Multi-storey student schemes – drylining, SFS and fire stopping.

Commercial
Offices and workplaces – partitions, feature ceilings and bulkheads.

Healthcare
Clinical wards and healthcare buildings – partitions, ceilings and fire stopping.

Hospitality
Bars, restaurants and leisure – coffered ceilings and feature details.

Industrial & logistics
Fire stopping and interiors to industrial and logistics units.

Retail & leisure
National retail programmes and unit fit-outs on fast-track turnarounds.

Residential
Apartment schemes – separating walls, linings and fire stopping.
Got a package to price?
Send us your drawings and programme.
From tender to handover
A clear, predictable process that keeps your programme moving.
Tender
We price from your drawings and specification, with clear inclusions, exclusions and programme assumptions.
Pre-start
RAMS, resources and sequencing agreed with your site team before we start.
Install & inspect
Experienced teams build to the manufacturer's specification, with work checked as it goes.
Handover
Snags closed out, and fire stopping labelled and recorded, ready for sign-off.

Got a package to price?
Send us your drawings, specification and programme. We'll come back with a clear, competitive price and the paperwork to get us approved quickly.







